Installation and commissioning of the mill at the time of the need to strictly follow these rules were, so you can ensure the safety of the machine effectively.

Go down

Installation and commissioning of the mill at the time of the need to strictly follow these rules were, so you can ensure the safety of the machine effectively. Empty Installation and commissioning of the mill at the time of the need to strictly follow these rules were, so you can ensure the safety of the machine effectively.

Post by vipeakclaire Wed Sep 10, 2014 8:05 am


1, the first gear hanging into the pit, pay attention to control a certain height and a central location, and then use a level correction "B" plane, but put aside the bolt hole.
2, Raymond machine host installation. Before installation pad in the lower plane of the base contact with the cement foundation and anchor bolts at the connection between <a href="http://www.mill-crushers.com/">crusher</a> the rubber shock pad (see Figure 2), and then use the frame-level meter calibration base "A" plane, the calibration points for cross-cross lines four points, while tone, its different axes should be less than 0.20 mm, E1 - E2 is not parallel degree not greater than 0.1 mm, "E1", "E2" the gap should be kept within 5-8 mm.
3, the location and height of the plumbing installation shall be the total figure may not arbitrarily change and heightening, the pipe joints should be sealed, without leaks after tightening. Electrical equipment should be accurate and reliable, the test machine should be carried out until after the parts installed.
(C) Raymond machine debugging (empty running test machine)
1, the pressure of the spring working height (effective height is compressed), the lower the pressure roller on the material, the greater, the higher the yield, but it should be based on the main motor load conditions, with the grinding rollers are grinding small gradually compressed. Pressure spring working height shall not exceed 80 ℃, the temperature rise should not exceed 35 ℃
2, empty load test machine running at no load test machine before grinding roller device should hold the rolled wire rope nets prison, avoiding contact with the impact roller and grinding ring, and then host the empty test machine running at least 1 hour; Host should operate smoothly, cabinets oil temperature must not exceed 80 ℃, temperature does not exceed 40 ℃. Analysis of the host machine direction of rotation shown in Figure 4.
3, the blower should be no-load power, and then loaded to be operating normally, and then observe its smooth operation, no abnormal noise and vibration, bearing the maximum temperature should not exceed 70 ℃, the temperature rise should not exceed 35 ℃.
4, the load test machine running time of less than eight hours, the whole machine is working properly without the Raymond abnormal noise, the pipe joints leak wind phenomenon, the test machine again after each fastener tightening, can be put into normal use.
fine grinder mill:http://www.mill-crushers.com/Mill_Series/YGMX_Series_High_Pressure_Ultrafine_Grinder.html