announcements of Precautions mill installation

Go down

announcements of Precautions mill installation  Empty announcements of Precautions mill installation

Post by vipeakclaire Wed Sep 10, 2014 8:08 am


1, when the mill is running the site yet installed, should be properly kept, exposed surfaces are coated with anti-rust oil, and avoid the sun and rain, to prevent rusting water body, to establish maintenance system.
2, plant and infrastructure should be based on the basis of sufficient height map size and mounting position, mills should be made ​​of high-standard cement foundation and be buried before being poured reinforced base and be buried conduit or cable channel. After pouring the cement foundation, there must be 15 days of the maintenance period.
3, should be equipped with 2 to 3 tons lifting tool, used for installation and maintenance.
4, the mill from the factory to use the time more than six months who host the central axis of the system, gear, roller device, analysis of oil pools should be cleaned checked, checked and cleaned after each component added to deal with enough oil.
http://www.mill-crushers.com/Production_Line/Symons_cone_crusher_production_line.html